Brighton Working Fire

Brighton Firefighters responded on 8/7/18 at 1545 Hrs for a report of a structure fire on Cresthill Ave.

Brighton Engine 6 went on location with heavy smoke showing. Brighton 9-1 went on location reporting fire showing from the roof. Command further reported fire in the attic.

Sheridan Park & Ellwood (FAST) responded as mutual aid to the scene.

The fire was placed under control in 24 minutes.